Codes

PEM1
225 MVAr MSCs at Pelham
Type: Upgrade existing circuits
Status: Strategic Optioneering
Boundaries: EC5E; EC5I; LE1
Region: East England
One new 225 MVAr switched capacitor (MSC) at Pelham would provide voltage support through East Anglia and North London as system flows increase in future.
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
PEM2
225 MVAr MSCs at Pelham
Type: Upgrade existing circuits
Status: Strategic Optioneering
Boundaries: EC5E; EC5I; LE1
Region: East England
One new 225 MVAr switched capacitor (MSC) at Pelham would provide voltage support through East Anglia and North London as system flows increase in future.
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
PKUP
Peterhead - Persley - Kintore 400kV upgrade.
Type: Upgrade existing circuits
Status: Design/development and consenting
Boundaries: B1a; B2; B4;
Region: Scotland
Upgrade and/or rebuild the circuits and equipment between Longside (Peterhead 2), Peterhead, Persley, Kintore, Fetteresso, Alyth, and Kincardine
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
PSDC
Spittal to Peterhead HVDC reinforcement
Type: Develop new circuits
Status: Planning/consenting
Boundaries: B0; B1aE; B1aF; B1aI; B2E; B2F; B2I; B4E; B4F; B4I
Region: Scotland
Establish a 400 kV substation at Spittal and construct a HVDC subsea link from the new 400 kV substation at Spittal to the existing 400 kV substation at Peterhead.
NOA 2021/22 Refresh Recommendation:
HND essential option
PSNC
New network need from North Wales to South Wales
Type: Develop new circuits
Status: Scoping
Boundaries: B8; B9; NW2; SW1Rev;
Region: North Wales and West Midlands
New network need from North Wales to South Wales. This would improve the west region by proposing an alternative route to the generation located in North Wales

Leading The Way: 2037

System Transformation: 2037
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
PTC1
Pentir to Trawsfynydd cable replacement
Type: Upgrade existing circuits
Status: Strategic Optioneering
Boundaries: NW2
Region: North Wales and West Midlands
Upgrade the cable section on the existing Pentir to Trawsfynydd circuit to allow this to operate at higher temperatures and increase the circuits thermal rating.
NOA 2021/22 Refresh Recommendation:
HND essential option
PTC2
Pentir – Trawsfynydd 1 A220 circuit upgrades (two cores per phase)
Type: Upgrade existing circuits
Status: Scoping
Boundaries: NW2;
Region: North Wales and West Midlands
Replace the conductors on the existing circuit between Pentir and Trawsfynydd with a higher capacity then was previosuly recommended
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
PTN2
Further upgrades of new 400kV circuit within North Wales established under PTNO
Type: Upgrade existing circuits
Status: Scoping
Boundaries: NW2;
Region: North Wales and West Midlands
New circuit in North Wales with a higher capacity then was previosuly recommended

Leading The Way: 2037

System Transformation: 2037
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
PTNO
A second transmission circuit on the existing Pentir to Trawsfynydd route
Type: Upgrade existing circuits
Status: Strategic Optioneering
Boundaries: NW2
Region:
Construct a second circuit in North Wales, making use of the existing transmission infrastructure to facilitate power transfer requirements across the relevant boundaries. Associated substation works are required at each end.
NOA 2021/22 Refresh Recommendation:
HND essential option
PWMS
Two 225MVAr MSCs at Penwortham
Type: Upgrade existing circuits
Status: Strategic Optioneering
Boundaries: B7aE; B7aI
Region: North England
Two new 225 MVAr switched capacitors (MSCs) at Penwortham substations would provide voltage support around Mersey area as system flows increase in future.
NOA 2021/22 Refresh Recommendation:
Hold