The electricity system is in a period of transition. There’s a shift from energy predominately being supplied by transmission connected generation to a world that includes large volumes of distribution connected generation, flexible demand and storage.
We must consider how this impacts the commercial and technical operation of transmission and distribution networks across the whole system.
National Grid ESO and distributed network operators (DNOs) are working with stakeholders across Great Britain through Regional Development Programmes (RDPs).
What is a Regional Development Programme?
A Regional Development Programme (RDP) is a project or study that looks at the electricity network across Great Britain. They identify areas of development between transmission and distribution networks in areas with large amounts of distributed energy resources (DERs). A DER is a small-scale power generation that operates locally and is connected to a larger power grid at the distribution level. These can include solar panels, small wind farms etc.
RDPs are designed to unlock additional network capacity, reduce constraints, and open new revenue streams for market participants. They aim to introduce new ways of working that significantly enhance transmission and distribution systems coordination and control, and they provide new tools and resources to manage system constraints – ultimately reducing costs for consumers. They 'design by doing', creating whole system efficiencies as quickly as possible.
If you’d like more information or would like to get involved, please email [email protected]
To find out more please read our factsheet below.
We also provide an overview of all of our RDP projects and work in the last year in the update document below.
MW Dispatch service details including visibility and control requirements
Our MW Dispatch RDPs with NGED and UKPN lay the pathway to consistent real time constraint management services from DER across GB. To find out more about the MW Dispatch functionality developed through these RDPs – including what visibility and control means for DNOs and DER service providers – please read our document below.
The South West of England is likely to play a big role in meeting the Government’s green energy targets because there is lots of renewable solar and wind generation in the area. But research showed that it is difficult to absorb that energy on the network. This RDP is analysing what the requirements and capabilities are needed in the area to overcome this challenge at the least cost to the consumer.
Read our Megawatt Dispatch Overview
This RDP is looking to extend the flexibility arrangements given to generation providers so that they apply for storage demand. This will enable storage projects to become part of the solution to network capacity issues, rather than capacity planning standards being a potential blocker to them.
This project seeks to allow energy storage, or other customers who can provide flexibility to the system, to participate in new whole system energy markets. It will also allow them to receive revenues for delivering services when the system requires flexibility to deliver capacity in constrained areas.
We are working with Western Power Distribution (WPD) on this project. It focuses on the transmission assets at the T-D boundary.
The aim of this project is to maximise the opportunities for more efficient deployment of distributed resources and reduce overall system costs for energy consumers.
The south-east coast area of England is where the project is focused as it is one of the most complex network areas in Europe. It has several interconnections to continental Europe, either currently in service or due to be commissioned, a nuclear power station, and a significant volume of renewable and traditional energy resources connected to the distribution network.
By unlocking more network capacity, reducing constraints and opening up new revenue streams for market participants, this project will enhance transmission and distribution systems coordination and control. This will create whole system efficiencies and provide new tools and resources to manage system constraints – ultimately reducing costs for customers.
With SP Transmission and SP Distribution, we are working on this RDP which focusses on the south-west of Scotland. There is huge potential for renewable electricity generation in this area, but that requires extensive and costly network reinforcements to get the energy to where it is needed by conventional means.
We’re are looking at new ways to use technology and operational methods to provide cost efficient outcomes for the renewable developments in the region. For the ESO to utilise the full potential of the transmission network in the future in this area of Scotland, both transmission connected generation and distributed energy resources should compete on a fair and equitable basis for access to the network.
Therefore, new arrangements for the connection of developments to the network, and provision of constraint management services will be developed. This will maximise the operation and management of the transmission network in the future. This RDP will create the necessary frameworks to achieve this ambition.
There is a lot of potential for wind resources in the north-west of England. In Heysham, the grid supply point (GSP) has reached thermal capacity limit for reverse power flow, across the existing three Super Grid Transformers (SGTs). It has also reached its switchgear fault level design limit.
Heysham GSP has had around 564MW of distributed energy resources connect to the distribution network since last year. Installation of a new SGT was suggested to add more thermal capacity at the Heysham GSP. However, delivery of an SGT is often an expensive and time consuming solution. The operation of the SGT at full capacity would also be restricted by the existing switchgear’s fault level limitations.
This analyses the Heysham GSP and the distribution network behind to deliver the most economic solution for consumers.