Search results
Filter by
Datasets (14)
- CSV
Balancing costs
This file contains the Electricity System Operator's (ESO) half-hourly BSUoS forecast (Balancing Services Use of System charge). The estimated BSUoS charge is calculated by taking the forecast…
- ZIP
- GeoJSON
- CSV
System
This dataset contains approximate GIS (Geographic Information System) geospatial boundaries associated with each of the Grid Supply Points (GSPs) on the GB transmission network. The boundaries have…
- CSV
Future Energy Scenarios
Long term electricity forecasts per region covering demand, demand side response and distributed generation based on our Future Energy Scenarios. Regions presented are Grid Supply Points (GSPs) and…
- CSV
Future Energy Scenarios
This dataset represents the regional results from the Spatial Heat model used as part of the Future Energy Scenarios. The 2021 data was generated to support a thought piece to explore the findings…
- ZIP
- GeoJSON
- PNG
System
This dataset contains approximate GIS (geographic information system) geospatial boundaries for each of the DNO License Areas in Great Britain. There are 14 licensed Distribution Network Operators (…
- CSV
Balancing costs
The publication consists of constraint breakdown information to provide additional transparency of why as ESO we are taking actions on the system. Please note that tags applied to actions can…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Trading
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal…,…
For any queries or feedback please contact [email protected]