Search results
Filter by
Datasets (12)
- CSV
Balancing costs
This file contains the Electricity System Operator's (ESO) half-hourly BSUoS forecast (Balancing Services Use of System charge). The estimated BSUoS charge is calculated by taking the forecast…
- CSV
Trading
Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of generators synchronized to the system by lowering the minimum generating level at a…
- XLSX
- CSV
- XLSM
Ancillary services
The Firm Frequency Response (FFR) post tender reports are published following each monthly tender. They indicate which tenders were accepted and rejected and the information submitted for these…
- XLSX
- CSV
Ancillary services
Frequency Response Products Market Information Report aims to give guidance on the response products requirement and updates on recent changes to procurement of those products.
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Balancing costs
The publication consists of constraint breakdown information to provide additional transparency of why as ESO we are taking actions on the system. Please note that tags applied to actions can…
- CSV
Constraint management
The number of voltage machine required for a given voltage group for upcoming weekend and following Monday to Friday. Given the complexity and locational nature of the voltage requirement, the actual…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Generation
This dataset contains NRAPM (Negative Reserve Active Power Margin) forecast for Daily 2-14 days ahead and Weekly for 2-52 weeks ahead for both National and Scotland. The purpose of the NRAPM forecast…
For any queries or feedback please contact [email protected]