Search results
Filter by
Datasets (11)
- CSV
Future Energy Scenarios
The Future Energy Scenarios (FES) represent a range of different, credible ways to decarbonise our energy system as we strive towards the 2050 target. One of the FES outputs is an agreed set of data…
- CSV
Demand Flexibility Service
Winter 2022/23 Data, The Demand Flexibility Service (DFS) has been developed to allow the ESO to access additional flexibility when the national demand is at its highest – during peak winter days –…
- CSV
Demand Flexibility Service
National Grid ESO are again launching the Demand Flexibility Service (DFS) for Winter 2023/24. The service allows the ESO to access additional flexibility when the national demand is at its highest…
- XLSX
- CSV
Balancing costs
The MBSS gives the costs and volumes of balancing services used by the ESO. These costs are broken into individual months in the past financial year, as well as by each individual service. The most…
- CSV
Trading
National Grid ESO procures balancing service contracts to balance demand and supply and to ensure the security and quality of electricity supply across Britain's transmission system. For some of…
- CSV
Constraint management
This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.
- CSV
Demand Flexibility Service
Winter 2022/23 Data, The Demand Flexibility Service (DFS) has been developed to allow the ESO to access additional flexibility when the national demand is at its highest – during peak winter days –…
- CSV
Constraint management
This dataset contains a year ahead Mega Watt constraint limits for the main boundaries on the transmission system., NOTE:, This dataset has now been replaced by the "24 Months Ahead Constraint…
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Constraint management
The number of voltage machine required for a given voltage group for upcoming weekend and following Monday to Friday. Given the complexity and locational nature of the voltage requirement, the actual…
For any queries or feedback please contact [email protected]