Search results
Filter by
Datasets (12)
- CSV
Future Energy Scenarios
Long term electricity forecasts per region covering demand, demand side response and distributed generation based on our Future Energy Scenarios. Regions presented are Grid Supply Points (GSPs) and…
- CSV
Trading
Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of generators synchronized to the system by lowering the minimum generating level at a…
- CSV
Future Energy Scenarios
The Future Energy Scenarios (FES) represent a range of different, credible ways to decarbonise our energy system as we strive towards the 2050 target. One of the FES outputs is an agreed set of data…
- CSV
Future Energy Scenarios
This dataset represents the regional results from the Spatial Heat model used as part of the Future Energy Scenarios. The 2021 data was generated to support a thought piece to explore the findings…
- CSV
Trading
National Grid ESO procures balancing service contracts to balance demand and supply and to ensure the security and quality of electricity supply across Britain's transmission system. For some of…
- CSV
Constraint management
This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.
- CSV
Constraint management
This dataset contains a year ahead Mega Watt constraint limits for the main boundaries on the transmission system., NOTE:, This dataset has now been replaced by the "24 Months Ahead Constraint…
- CSV
Future Energy Scenarios
We have been working with the other network companies as part of the Energy Networks Association (ENA) Open Networks project. The Whole System Electricity Future Energy Scenarios (FES) part of this…
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Constraint management
The number of voltage machine required for a given voltage group for upcoming weekend and following Monday to Friday. Given the complexity and locational nature of the voltage requirement, the actual…
For any queries or feedback please contact [email protected]