Search results
Filter by
Datasets (9)
- CSV
Future Energy Scenarios
The Future Energy Scenarios (FES) represent a range of different, credible ways to decarbonise our energy system as we strive towards the 2050 target. One of the FES outputs is an agreed set of data…
- CSV
Demand Flexibility Service
Winter 2022/23 Data, The Demand Flexibility Service (DFS) has been developed to allow the ESO to access additional flexibility when the national demand is at its highest – during peak winter days –…
- CSV
Demand Flexibility Service
Winter 2022/23 Data, The Demand Flexibility Service (DFS) has been developed to allow the ESO to access additional flexibility when the national demand is at its highest – during peak winter days –…
- CSV
Demand Flexibility Service
National Grid ESO are again launching the Demand Flexibility Service (DFS) for Winter 2023/24. The service allows the ESO to access additional flexibility when the national demand is at its highest…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
Trading
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal…,…
For any queries or feedback please contact [email protected]