Search results
Filter by
Datasets (9)
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
- DOC
Demand
This publication is similar to "Historic Demand Data" dataset but updated on a daily basis with approximately ten days lag in receiving settlement data. In the dataset embedded forecast for…
- DOC
- CSV
Demand
This section contains historic electricity demand, interconnector, hydro storage pumping, Non-BM Short Term Operating Reserve (STOR), wind and solar outturn data., Note, : We are currently…
- CSV
Carbon intensity
The carbon intensity of balancing actions measures the difference between the carbon intensity of the combined Final Physical Notice (FPN) of machines in the Balancing Mechanism (BM) and the…
- CSV
Trading
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal…,…
- CSV
Carbon intensity
This dataset contains country carbon intensity forecast for the GB electricity system.The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
Carbon intensity
This dataset contains regional carbon intensity forecast for the GB electricity system.The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
Carbon intensity
This dataset contains national carbon intensity forecast for the GB electricity system. The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
- DOC
Generation
Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
For any queries or feedback please contact [email protected]