Search results
Filter by
Datasets (4)
- CSV
Ancillary services
In our role as Electricity System Operator (ESO), we balance generation and demand in real time. When demand is low, there may be a requirement for additional flexibility to balance generation and…
- CSV
Future Energy Scenarios
Long term electricity forecasts per region covering demand, demand side response and distributed generation based on our Future Energy Scenarios. Regions presented are Grid Supply Points (GSPs) and…
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Trading
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal…,…
For any queries or feedback please contact [email protected]