Datasets (12)
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Constraint management
To give greater insight on balancing decisions, this post monthly report provides outturn system costs for maintaining voltage levels on the network. Maintaining the electricity system at the correct…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
System
This page holds the historic system frequency data for Great Britain at a 1 second resolution. It is the role of the National Grid ESO to keep the system frequency at 50 Hz, with a statutory limit of…
- CSV
Trading
This dataset contains data for historic GTMA (Grid Trade Master Agreement) trades conducted since April 2015. The data includes the trade ID, start and end time and date, the volume in MW, the price…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
For any queries or feedback please contact [email protected]