Search results
Filter by
Datasets (6)
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Balancing costs
The publication consists of constraint breakdown information to provide additional transparency of why as ESO we are taking actions on the system. Please note that tags applied to actions can…
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
For any queries or feedback please contact [email protected]