Search results
Filter by
Datasets (4)
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
- DOC
Demand
This publication is similar to "Historic Demand Data" dataset but updated on a daily basis with approximately ten days lag in receiving settlement data. In the dataset embedded forecast for…
- DOC
- CSV
Demand
This section contains historic electricity demand, interconnector, hydro storage pumping, Non-BM Short Term Operating Reserve (STOR), wind and solar outturn data., Note, : We are currently…
- CSV
- DOC
Generation
Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
For any queries or feedback please contact [email protected]