Search results
Filter by
Datasets (11)
- ZIP
- GeoJSON
- CSV
System
This dataset contains approximate GIS (Geographic Information System) geospatial boundaries associated with each of the Grid Supply Points (GSPs) on the GB transmission network. The boundaries have…
- CSV
Future Energy Scenarios
We have been working with the other network companies as part of the Energy Networks Association (ENA) Open Networks project. The Whole System Electricity Future Energy Scenarios (FES) part of this…
- CSV
Trading
Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of generators synchronized to the system by lowering the minimum generating level at a…
- ZIP
- GeoJSON
Network charges
This dataset contains approximate GIS (geographic information system) geospatial boundaries for each of the TNUoS generation zones in Great Britain. There are 27 TNUoS generation zones, and each is…
- CSV
Ancillary services
The “Contract Transfer of Obligation” will be updated when ESO receives a Market Provider request to transfer a Balancing Service contract from a contracted unit to a non-contracted unit. This file…
- ZIP
- GeoJSON
- PNG
System
This dataset contains approximate GIS (geographic information system) geospatial boundaries for each of the DNO License Areas in Great Britain. There are 14 licensed Distribution Network Operators (…
- CSV
Ancillary services
A set of auction result views which present the outcome of daily Balancing Reserve (BR) auction runs. The EAC-BR Auction Results are updated daily in the morning and are available in the listed…,…
- CSV
- DOC
Generation
Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
For any queries or feedback please contact [email protected]