Search results
Filter by
Datasets (4)
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Ancillary services
The current suite of response services (DC, DM, and DR) are now being procured via the EAC platform. The daily auction results will now be published below. The previous results page will no longer be…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
For any queries or feedback please contact [email protected]