Search results
Filter by
Datasets (12)
- CSV
Network charges
This dataset contains a breakdown of all the Transmission Network Use of System (TNUoS) tariff elements of which are forecasted and set by the revenue team at National Grid ESO. These files will be…
- CSV
Generation
Metered wind output in MW for Scotland, England, and Wales. Output is provided per date per settlement period. Please note that this data is from operational metering and is therefore expected to be…
- CSV
- DOC
Demand
This publication is similar to "Historic Demand Data" dataset but updated on a daily basis with approximately ten days lag in receiving settlement data. In the dataset embedded forecast for…
- DOC
- CSV
Demand
This section contains historic electricity demand, interconnector, hydro storage pumping, Non-BM Short Term Operating Reserve (STOR), wind and solar outturn data., Note, : We are currently…
- PNG
- CSV
Balancing costs
This dataset is a component of the Forward Plan 2020-21 commitment to increase the transparency of our operational decision making in the Balancing Mechanism (BM). It includes the publication of…
- CSV
Ancillary services
The ESO publishes non-BM instruction data from our ASDP system. This data is published in near real-time from the ASDP every 30 seconds. A new monthly file is only created when a new set of…
- CSV
Generation
The dataset contains national and anonymised BMU-Level 0-14 day ahead wind forecasts for all the windfarms which are used to produce ESO's national day ahead incentive wind forecasts available…
- CSV
- DOC
Generation
Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead.
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.
For any queries or feedback please contact [email protected]