Search results
Filter by
Datasets (5)
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Constraint management
This dataset contains a year ahead Mega Watt constraint limits for the main boundaries on the transmission system., NOTE:, This dataset has now been replaced by the "24 Months Ahead Constraint…
- CSV
Constraint management
To give greater insight on balancing decisions, this post monthly report provides outturn system costs for maintaining voltage levels on the network. Maintaining the electricity system at the correct…
- CSV
Constraint management
This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
For any queries or feedback please contact [email protected]