We are required to establish statements and guidelines in accordance with special condition C16 of the statements of the transmission licence. On this page you will find all C16-related documents, including consultations.
Join our C16 Mailing List
To keep up to date with the latest C16 news and publications please sign up to our mailing list.
Here you can find the latest versions of C16-related statements including the Balancing Principles Statement Report and guidelines.
Latest versions
Here you can find previous versions of C16-related statements and guidelines.
Procurement Guidelines
Balancing services adjustment data (BSAD)
Balancing principles statement report
By accessing these reports, you are agreeing to our terms and conditions.
System management action flagging
System management action flagging (SMAF) report
Applicable balancing services volume data (ABSVD)
Balancing Principles Statement
On an annual basis, we undertake consultations in respect of the C16 statements. Where applicable we may be required to undertake additional consultations outside of the standard annual review.
Stakeholder webinar for transmission licence condition C16 and RBS guidelines
Consultation documents
2023-24
2021-22
2020-21
2019-20
2018-19
2017-18
2017 ABSVD Informal
2016-17
2015-16
2014-15
2013-14
2012-13
2011-12
2010-11
2009-10
Name | Published Sort descending |
---|---|
TRACC paper | 18 Oct 2017 |
Consultation - P217A and Review | 18 Oct 2017 |
Consultation Report - BSAD and SMAF | 18 Oct 2017 |
SMAF - Appendix D | 18 Oct 2017 |
C16 Authority Report - Appendix G | 18 Oct 2017 |
C16 PG Appendix B - 'cat 5' | 18 Oct 2017 |
These documents outline the GB methodology for commercial arrangements for payments relating to interconnector (IC) capacity restrictions resulting from NTC restrictions set by National Grid Electricity System Operator (NGESO). The commercial arrangements in these documents should be applied to:
- all interconnector projects (existing and future) that are connected to the GB transmission system
- capacity calculations made both before and after the firmness deadline
This methodology should be applied in full to ensure consistency of NTC arrangements across all GB connected interconnectors.