We are required to establish statements and guidelines in accordance with special condition C16 of the statements of the transmission licence. On this page you will find all C16-related documents, including consultations.  

Image
Wind turbines in sea

Join our C16 Mailing List

To keep up to date with the latest C16 news and publications please sign up to our mailing list.

Current statements and guidelines

Here you can find the latest versions of C16-related statements including the Balancing Principles Statement Report and guidelines.

Latest versions

Previous statements and guidelines

Here you can find previous versions of C16-related statements and guidelines.

Procurement Guidelines

Balancing services adjustment data (BSAD)

System management action flagging

Applicable balancing services volume data (ABSVD)

Balancing Principles Statement

C16 Consultations

On an annual basis, we undertake consultations in respect of the C16 statements. Where applicable we may be required to undertake additional consultations outside of the standard annual review.

Rich text

Stakeholder webinar for transmission licence condition C16 and RBS guidelines

Watch the webinar

 

Consultation documents

Past C16 consultations

2020-21

2018-19

2017 ABSVD Informal

2010-11

NTC commercial compensation methodology consultation

These documents outline the GB methodology for commercial arrangements for payments relating to interconnector (IC) capacity restrictions resulting from NTC restrictions set by National Grid Electricity System Operator (NGESO). The commercial arrangements in these documents should be applied to:

  • all interconnector projects (existing and future) that are connected to the GB transmission system
  • capacity calculations made both before and after the firmness deadline

This methodology should be applied in full to ensure consistency of NTC arrangements across all GB connected interconnectors.

NTC consultation documents