Search results
Filter by
Datasets (14)
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Constraint management
This dataset contains a year ahead Mega Watt constraint limits for the main boundaries on the transmission system., NOTE:, This dataset has now been replaced by the "24 Months Ahead Constraint…
- CSV
Trading
Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of generators synchronized to the system by lowering the minimum generating level at a…
- CSV
Balancing costs
This dataset provides indicative values for the average daily price (in £ per GVAs) for BM accepted offers tagged as being for System Inertia. It also includes the cost of bid actions required to…
- CSV
Constraint management
This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
- CSV
Constraint management
To give greater insight on balancing decisions, this post monthly report provides outturn system costs for maintaining voltage levels on the network. Maintaining the electricity system at the correct…
- XLSX
- CSV
Balancing costs
The Balancing Services Use of System (BSUoS) costs are reported on a monthly basis with a forecast for the next month and a rolling 24 month period. Here you can find the data for the 24 month ahead…
- CSV
Constraint management
The number of voltage machine required for a given voltage group for upcoming weekend and following Monday to Friday. Given the complexity and locational nature of the voltage requirement, the actual…
- CSV
Constraint management
A snapshot of the limits and flows at relevant boundaries at day ahead stage. These flow values are true for when the measurement was taken and will not reflect any changes in the flows following the…
For any queries or feedback please contact [email protected]