Search results
Filter by
Datasets (5)
- CSV
Ancillary services
In our role as Electricity System Operator (ESO), we balance generation and demand in real time. When demand is low, there may be a requirement for additional flexibility to balance generation and…
- CSV
Network charges
This dataset contains a breakdown of all the Transmission Network Use of System (TNUoS) tariff elements of which are forecasted and set by the revenue team at National Grid ESO. These files will be…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
For any queries or feedback please contact [email protected]