Search results
Filter by
Datasets (14)
- CSV
Demand
This dataset contains incremental updates for 2-52 weeks ahead demand forecast. The forecast assist the industry to make efficient decisions in balancing their supply and demand positions.
- XLSX
- PNG
- CSV
Constraint management
Thermal constraints are taken when the amount of energy that would flow naturally from one region to another exceeds the capacity of the circuits connecting the two regions. This dataset provides…
- CSV
Constraint management
To give greater insight on balancing decisions, this post monthly report provides outturn system costs for maintaining voltage levels on the network. Maintaining the electricity system at the correct…
- CSV
Constraint management
A snapshot of the limits and flows at relevant boundaries at day ahead stage. These flow values are true for when the measurement was taken and will not reflect any changes in the flows following the…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
Generation
The dataset contains national and BMU wind forecast over a day ahead timescale as well as all historic day ahead wind forecasts to assist the industry to make efficient decisions in balancing their…
- CSV
- PNG
Demand
This dataset contains national electricity demand forecast for day ahead as well as all historic day ahead demand forecasts. The forecast assist the industry to make efficient decisions in balancing…
- CSV
Demand
This dataset contains national electricity demand forecasts for 2-14 days ahead (medium term) as well as all historic 2-14 days ahead forecasts. These forecasts assist the industry to make efficient…
For any queries or feedback please contact [email protected]