Search results
Filter by
Datasets (5)
- CSV
Demand
There are a number of factors which influence transmission losses. These include variations in zonal generation patterns, growth in northern vs southern generation, level of Scottish exports to…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
Trading
This dataset contains data for historic GTMA (Grid Trade Master Agreement) trades conducted since April 2015. The data includes the trade ID, start and end time and date, the volume in MW, the price…
For any queries or feedback please contact [email protected]