Search results
Filter by
Datasets (5)
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
Ancillary services
The dataset contains forecasts of our Dynamic Containment Low and High requirements for the next 4-days. The methodology uses forecasted demand, inertia, and response volumes as well as a view of the…
- CSV
Network charges
This dataset contains a breakdown of all the Transmission Network Use of System (TNUoS) tariff elements of which are forecasted and set by the revenue team at National Grid ESO. These files will be…
For any queries or feedback please contact [email protected]