Search results
Filter by
Datasets (9)
- XLSX
- PNG
- CSV
Constraint management
Thermal constraints are taken when the amount of energy that would flow naturally from one region to another exceeds the capacity of the circuits connecting the two regions. This dataset provides…
- CSV
Balancing costs
The publication consists of constraint breakdown information to provide additional transparency of why as ESO we are taking actions on the system. Please note that tags applied to actions can…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
Carbon intensity
The carbon intensity of balancing actions measures the difference between the carbon intensity of the combined Final Physical Notice (FPN) of machines in the Balancing Mechanism (BM) and the…
- CSV
Carbon intensity
This dataset contains country carbon intensity forecast for the GB electricity system.The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
Carbon intensity
This dataset contains regional carbon intensity forecast for the GB electricity system.The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
Carbon intensity
This dataset contains national carbon intensity forecast for the GB electricity system. The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
For any queries or feedback please contact [email protected]