Search results
Filter by
Datasets (13)
- CSV
Balancing costs
This file contains the Electricity System Operator's (ESO) half-hourly BSUoS forecast (Balancing Services Use of System charge). The estimated BSUoS charge is calculated by taking the forecast…
- XLSX
- CSV
Balancing costs
The Balancing Services Use of System (BSUoS) costs are reported on a monthly basis with a forecast for the next month and a rolling 24 month period. Here you can find the data for the 24 month ahead…
- CSV
Trading
National Grid ESO procures balancing service contracts to balance demand and supply and to ensure the security and quality of electricity supply across Britain's transmission system. For some of…
- ZIP
- GeoJSON
- PNG
System
This dataset contains approximate GIS (geographic information system) geospatial boundaries for each of the DNO License Areas in Great Britain. There are 14 licensed Distribution Network Operators (…
- CSV
Constraint management
This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.
- CSV
Constraint management
This dataset contains a year ahead Mega Watt constraint limits for the main boundaries on the transmission system., NOTE:, This dataset has now been replaced by the "24 Months Ahead Constraint…
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- ZIP
- GeoJSON
- CSV
System
This dataset contains approximate GIS (Geographic Information System) geospatial boundaries associated with each of the Grid Supply Points (GSPs) on the GB transmission network. The boundaries have…
- CSV
Constraint management
The number of voltage machine required for a given voltage group for upcoming weekend and following Monday to Friday. Given the complexity and locational nature of the voltage requirement, the actual…
- CSV
Balancing costs
The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users…
For any queries or feedback please contact [email protected]