Search results
Filter by
Datasets (3)
- CSV
Constraint management
This dataset contains the 24-month ahead constraint costs on a monthly basis for the main boundaries on the transmission system. These costs are the costs of managing constraint boundaries (for…
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Trading
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal…,…
For any queries or feedback please contact [email protected]