Search results
Filter by
Datasets (12)
- CSV
Trading
Index Linked Contract can be used by National Grid ESO to meet the voltage voltage requirement . The contract is normally enacted in the morning ahead of the power exchange auction. The generator…
- CSV
Trading
Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of generators synchronized to the system by lowering the minimum generating level at a…
- XLSX
- CSV
- XLSM
Ancillary services
The Firm Frequency Response (FFR) post tender reports are published following each monthly tender. They indicate which tenders were accepted and rejected and the information submitted for these…
- XLSX
- CSV
Ancillary services
Frequency Response Products Market Information Report aims to give guidance on the response products requirement and updates on recent changes to procurement of those products.
- CSV
System
This dataset gives indicative information on the availability and utilisation of Stability Pathfinder contracts. The information is provided at a settlement period resolution for all contracted units…
- CSV
Ancillary services
As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating Reserve (STOR). The daily results from the auction are available here.
- CSV
Trading
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal…,…
- CSV
- DOC
Generation
Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead.
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.
For any queries or feedback please contact [email protected]