Search results
Filter by
Datasets (7)
- CSV
Future Energy Scenarios
We have been working with the other network companies as part of the Energy Networks Association (ENA) Open Networks project. The Whole System Electricity Future Energy Scenarios (FES) part of this…
- CSV
System
This dataset gives indicative information on the availability and utilisation of Stability Pathfinder contracts. The information is provided at a settlement period resolution for all contracted units…
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead.
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.
For any queries or feedback please contact [email protected]