Search results
Filter by
Datasets (6)
- CSV
Ancillary services
In our role as Electricity System Operator (ESO), we balance generation and demand in real time. When demand is low, there may be a requirement for additional flexibility to balance generation and…
- CSV
System
This dataset gives indicative information on the availability and utilisation of Stability Pathfinder contracts. The information is provided at a settlement period resolution for all contracted units…
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead.
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.
- CSV
Trading
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal…,…
For any queries or feedback please contact [email protected]