Search results
Filter by
Datasets (3)
- CSV
Constraint management
This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.
- ZIP
- CSV
System
As part of our daily planning processes within the ESO control room, the control room strategy team produces a System Operating Plan (SOP) at key demand peaks or troughs throughout the day, at what…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
For any queries or feedback please contact [email protected]