Datasets (4)
- CSV
Constraint management
This dataset contains a year ahead Mega Watt constraint limits for the main boundaries on the transmission system., NOTE:, This dataset has now been replaced by the "24 Months Ahead Constraint…
- CSV
Constraint management
This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- ZIP
- CSV
System
As part of our daily planning processes within the ESO control room, the control room strategy team produces a System Operating Plan (SOP) at key demand peaks or troughs throughout the day, at what…