Search results
Filter by
Datasets (5)
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Future Energy Scenarios
We have been working with the other network companies as part of the Energy Networks Association (ENA) Open Networks project. The Whole System Electricity Future Energy Scenarios (FES) part of this…
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
For any queries or feedback please contact [email protected]