Our response to coronavirus

Find out how we're working to keep Great Britain’s lights on reliably throughout the outbreak

PA066: STCP19-3 Clarification of Transmission System Boundary Point Registration with Elexon

Minor amendments to STCP19-3 to add clarification on the requirement to register with Elexon all new connections to the GB Transmission System as new Transmission System Boundary Points (TSBP).Clarity to be added on the roles of TO and NGET, the required notification period and connection types requiring registration.

Modification status: Concluded

Last updated: 13 May 2020