GSR016: Small and Medium Embedded Generation Assumptions

The Workgroup considers issues and interactions that arise when applying NETS SQSS Section 2 and Section 4 criteria due to the size of the connection(small and medium vs large), the connection point (transmission vs embedded), and the contractual arrangement (BM Participant vs Non-BM Participant).

Modification status: Concluded

Last updated: 29 November 2021

Code Administrator Contact[email protected]

Governance Route: Standard Governance

Impacts:

Medium: Transmission Licensees Generators

Low: Networks Operators

Implemented: 01 April 2019