GSR016: Small and Medium Embedded Generation Assumptions

The Workgroup considers issues and interactions that arise when applying NETS SQSS Section 2 and Section 4 criteria due to the size of the connection(small and medium vs large), the connection point (transmission vs embedded), and the contractual arrangement (BM Participant vs Non-BM Participant).

Modification status: Current - Authority Decision received 25 May 2018 Implementation date to be confirmed

Last updated: 13 May 2020