The Frequency Risk and Control Report includes an assessment of the magnitude, duration and likelihood of transient frequency deviations, forecast impact and the cost of securing the system and confirms which risks will or will not be secured operationally.

The requirement for a Frequency Risk and Control Report was introduced following the approval of Security and Quality of Supply Standards (SQSS) modification GSR027. The first version of the report was submitted to Ofgem on 1 April 2021 and approved on 12 May 2021.

The FRCR is produced at least once annually and is consulted on with industry and reviewed by the SQSS Panel ahead of submission to Ofgem.

The 2024 FRCR report was consulted between 10 April 2024 and 17 May 2024, and submitted to Ofgem for approval on 12 July 2024. The updated report includes summaries of consultation responses and discussions with SQSS panel.

For more information please contact [email protected].