Our response to coronavirus

Find out how we're working to keep Great Britain’s lights on reliably throughout the outbreak

CAP156 - Reactive Power Default Payment Rate – Use of Spectron Power Index

Amendment to Schedule 3, Appendix 1 part 3.1 and 3.2 of the CUSC to remove the Spectron cumulative over the counter power index from the calculation of the reactive default payment rate as it is no longer being published.

Modification status: Concluded

Last updated: 13 May 2020

Documents

Proposal

Workgroup meetings and summary papers

Sorry, no documents found.

Workgroup consultation

Sorry, no documents found.

Code administrator consultation

Draft/Final modification report