CAP097 - Revision to the contractual requirements for Small and Medium Embedded Power Stations under CUSC 6.5.

This Amendment Proposal clarifies NGC’s requirements from Embedded Small and Medium Power Stations in order to efficiently discharge its obligations imposed through the Transmission Licence and the Act.   In setting out the requirements this Amendment Proposal recognises the Grid Code LEEMPS proposal in relation to the NGC/ DNO / Medium Power Station interfaces and seeks to ensure the CUSC processes under CUSC 6.5 are consistent with the requirements of the Grid Code.

Modification status: Concluded

Last updated: 13 May 2020

Documents

Proposal

Workgroup meetings and summary papers

Sorry, no documents found.

Workgroup consultation

Code administrator consultation

Sorry, no documents found.

Draft/Final modification report

Authority decision