GSR014: Offshore Transformer Requirements

This modification was raised to investigate whether the current requirements for two transformers and substation bays where offshore cables connect to the onshore network is really necessary or whether two transformers connected to a single bay or even a single transformer and bay would be sufficient.

Modification status: Concluded

Last updated: 13 May 2020