You can raise a modification – or mod – when you want to propose a change to any part of the Grid Code. 

For more information, please contact [email protected]

Search for any current or concluded modifications by name or ID. You can sort mods by ID, name, status or date of update. Or filter according to status.

Views reference
Modification status
ID Name Status Last Updated
GC0121 GC0121 - Grid Code changes in the event the UK leaves the EU without an agreement Concluded
GC0120 GC0120 - National Grid legal separation changes to clarify Grid Code responsibilities and consequential changes Concluded
GC0110 GC0110: LFSM-O compliance requirements for Type As and B PGMs Concluded
GC0119 GC0119: Post Open Governance Implementation Housekeeping Changes Concluded
GC0118 GC0118: Modification to the Grid Code to accommodate the recent Distribution Code modification to Engineering Recommendation P28 –Voltage fluctuations and the connection of disturbing equipment to transmission systems and distribution networks in the UK Concluded
GC0117 GC0117: Improving transparency and consistency of access arrangements across GB by the creation of a pan-GB commonality of Power Station requirements Current
GC0116 GC0116: Correction to the compliance dates included in modifications GC0100-102 for the Requirements for Generators (RfG) and HVDC European Network Codes and other minor housekeeping changes Concluded
GC0115 GC0115: Legal Separation housekeeping: NGET to The Company Concluded
GC0114 GC0114: System Operation Guideline: Prequalification Processes Concluded
GC0113 GC0113: The open, transparent, non-discriminatory and timely publication of the generic and user specific values required to be specified by the relevant TSO(s) and / or relevant system operator et al., in accordance with the DCC Concluded

More about modifications

Modification Tracker

Our Tracker gives you the latest details on current code modifications including the purpose and the stakeholders it affects, as well as panel comments and where it is in the review process. It is published on the 7th (or next working day) of each month.

Modification Proposal Form

If you're thinking about raising a modification, please get in touch with us. Our experts can give you advice on your Proposal, explain how the modification process works and help to answer any questions you may have. When we receive your Proposal, we'll check it through and work together to make sure it's easy to understand.

Calendar

Once you've been in touch and are ready to write your Proposal paper, send it to us by the monthly modification submission date which you can find on our Calendar.