GC0102: EU Connection Codes GB Implementation – Mod 3

This modification (3/4) will set out within the Grid Code the following compliance obligations in the EU Connection Codes:

  1. Set the System Management parameters, as set out in RfG and HVDC
  2. Set the Compliance requirements, as set out in RfG, DCC and HVDC

Modification status: Concluded

Last updated: 24 March 2020

 

    Documents

    Authority Decision