GC0154: Incorporation of interconnector ramping requirements into the Grid Code as per SOGL Article 119

 Article 119 (1) (c)  of the System Operator Guideline (SOGL) relating to the Load Frequency Control (LFC) block operational methodology requires ramping arrangements for active power output of HVDC interconnectors to be codified.

Modification status: Current

Last updated: 19 January 2022

Code Administrator Contact: Sally Musaka - [email protected] 

Impacts: High - on Interconnectors as the relevant SOGL Article refers to the HVDC Interconnector ramping restrictions for active power

Documents

Proposal Documents

Workgroup Consultation

Sorry, no documents found.

Workgroup Report

Sorry, no documents found.

Code Administrator Consultation

Sorry, no documents found.

Draft / Final Modification Reports

Sorry, no documents found.

Decision

Sorry, no documents found.