GC0151: Grid Code Compliance with Fault Ride Through Requirements

Proposal to change the Grid Code with respect to the process followed by Users, Network Operators and the ESO in the event of a Fault Ride Through occurrence where a User’s site or Network Operator’s asset(s) coincidently trips/de-loads.  

Modification status:
Concluded - GC0151: Grid Code Compliance with Fault Ride Through Requirements
Last updated:
20 March 2024

Code Administrator Contact[email protected]

Governance Route: Standard Governance

Impacts:

High: Generators, Transmission System Operators, Interconnectors, Transmission Owners, Distribution Owners

Implementation: 08 November 2021

Code modification proposed by:
Garth Graham