GC0146: Solutions for frequency control of Power Park Modules

This modification is proposed to modify the existing requirement for frequency control at Power Park Modules (PPM) level and allow flexibility for Users to be able to choose a control solution at BM Unit level. The proposal does not seek to modify the current frequency response, but only the way the response is achieved.

Modification status: Current - Workgroup

Last updated: 13 March 2022

Code Administrator Contact: Ruth Roberts - [email protected]eso.com

Governance Route: Standard Governance

Impacts: Medium - Generators with Power Park Modules

 