CMP370: Revision of the connection offer acceptance period for interactive connection offers

A new Interactivity policy has been developed collaboratively with industry through the Energy Networks Association (ENA) Open Network Projects. This CUSC modification seeks to align the CUSC with this Interactivity policy.

Modification status:
Concluded - CMP370: Revision of the connection offer acceptance period for interactive connection offers
Last updated:
20 March 2024

Code Administrator Contact: Paul Mullen - p[email protected]

Governance Route: Standard Governance

Impacts: Medium - For the ESO, Onshore and Offshore Transmission Owners, DNOs and Users wanting to connect to the National Electricity Transmission System (NETS)

Implemented: 4 October 2021

Code modification proposed by:
Keren Kelly

Documents