CMP370 'Revision of the connection offer acceptance period for interactive connection offers'

A new Interactivity policy has been developed collaboratively with industry through the Energy Networks Association (ENA) Open Network Projects. This CUSC modification seeks to align the CUSC with this Interactivity policy.

Modification status: Current - Awaiting Decision

Last updated: 20 September 2021