CMP331: Option to replace generic Annual Load Factors (ALFs) with site specific ALFs

The purpose of this modification is to provide new generators with the option to replace the generic Annual Load Factors (ALFs) used to determine their TNUoS charges with a site-specific ALF. The site-specific ALF will be based on the generators expected output and require approval from the ESO.

Modification status: Current - Workgroup

Last updated: 22 February 2022

Code Administrator Contact: Paul Mullen - [email protected]

Governance Route: Standard Governance

Impacts:

* Medium: New Transmission connected generators

* Low: Existing Transmission connected generators; National Grid ESO

Documents

Proposal Documents

Workgroup Meetings and Summary papers

Sorry, no documents found.

Workgroup Consultation

Sorry, no documents found.

Workgroup Report

Sorry, no documents found.

Code Administrator Consultation

Sorry, no documents found.

Draft / Final Modification report

Sorry, no documents found.

Decision

Sorry, no documents found.