CMP317 & CMP327: Removing Generator Residual and excluding assets required for connection

To define which elements of generator TNUoS pertain to assets required for connection, establish a methodology for maintaining compliance with the range of €0-2.50/MWh for the purposes of EU regulation 838/2010 and remove the generator residual as directed by the Authority. To watch the National Grid ESO Webinar on potential TCR changes, please use this link. Slides are also available on the "Webinar Slides" tab on this page.

Modification status:
Concluded - CMP317 & CMP327: Removing Generator Residual and excluding assets required for connection
Last updated:
20 March 2024

Code Administrator Contact: [email protected]

Governance Route: Standard 

Impacts:

* High: Users liable for Generator TNUoS charges, The Company

Implemented: 1 April 2021

Documents