Skip to main navigation
Home
ESO
  • ESO
  • Group PLC
  • NG in the UK
  • NG in the US
  • Careers
  • Investors
  • Data Portal
  • Calendar
  • News
  • Contact us
  • Back
  • Who we are
    • Back
    • Home
    • Who we are
    • What we do
      • Back
      • Who we are
      • What we do
      • Work with us
      • Our people
      • How we're organised
      • How we're regulated
      • Meet the board
      • Our Executive Team
      • The Future System Operator (FSO)
      • Stakeholder groups
      • Our global network
      • Compliance statements
    • Electricity National Control Centre
      • Back
      • Who we are
      • Electricity National Control Centre
      • What does the Electricity National Control Centre do?
      • What is the Balancing Mechanism?
      • How does the ENCC handle severe weather?
      • What does a day in the ENCC look like?
      • Operational Transparency Forum
    • Electricity Markets
      • Back
      • Who we are
      • Electricity Markets
      • Electricity markets explained
      • Publications and projects
      • The role of the ESO Markets team
  • Electricity explained
    • Back
    • Home
    • Electricity explained
    • What is electricity?
    • How is electricity generated?
    • How does electricity move around?
    • How do we balance the grid?
    • What to do in a power cut
    • How is electricity priced?
    • Electricity and me
    • Monthly Insights
  • A net zero future
    • Back
    • Home
    • A net zero future
    • Our progress towards net zero
      • Back
      • A net zero future
      • Our progress towards net zero
      • Carbon Intensity Dashboard
      • Road to Zero Carbon report
      • Road to Zero Carbon in numbers
    • Our net zero work
      • Back
      • A net zero future
      • Our net zero work
      • Future Energy Scenarios (FES)
      • Virtual Energy System
      • Innovation
      • Projects
      • The Pathway to 2030 Holistic Network Design
      • Empowering climate action
      • Bridging the Gap to net zero
      • Our RIIO-2 plans
    • Net zero explained
      • Back
      • A net zero future
      • Net zero explained
      • What is net zero and zero carbon?
      • Renewable energy
      • Electric vehicles
      • What is carbon intensity?
  • Industry information
    • Back
    • Home
    • Industry information
    • Connections
      • Back
      • Industry information
      • Connections
      • Our role in connections
      • The connections offer process
      • Your connections journey
      • Reports and registers
      • Connections Portal
      • Use of System (UoS) and Virtual Lead Party (VLP)
      • Connections help and support
      • TEC Amnesty
    • Balancing Services
      • Back
      • Industry information
      • Balancing Services
      • Future of balancing services
      • Demand Flexibility Service
      • Frequency response services
      • Reserve services
      • System security services
      • Reactive power services
      • Trading
      • Settlements
      • Local Constraint Market
      • Balancing Mechanism Wider Access
      • Electricity System Restoration Standard
      • Power Responsive
      • Balancing programme
      • Single Markets Platform
    • Charging
      • Back
      • Industry information
      • Charging
      • Balancing Services Use of System (BSUoS) charges
      • Transmission Network Use of System (TNUoS) charges
      • Assistance for Areas with High Electricity Distribution Costs (AAHEDC)
      • Connection charges
      • Charging guidance
      • Charging policy developments
      • Charging statements
      • Our consultation responses
    • Codes
      • Back
      • Industry information
      • Codes
      • Code changes: Beginner's Guide
      • Connection and Use of System Code (CUSC)
      • Grid Code (GC)
      • System Operator Transmission Owner Code
      • Security and Quality of Supply Standard (SQSS)
      • Balancing Settlement Code (BSC)
      • Digitalised Whole System Technical Code (WSTC)
      • European Network Codes (ENC)
      • About the Codes Team
    • Industry Data and Reports
      • Back
      • Industry information
      • Industry Data and Reports
      • System Performance Reports
      • Balancing services performance monitoring report
      • Data finder and explorer
      • Forecast volumes and costs
      • System balancing reports
      • System constraints
    • Winter Operations
      • Back
      • Industry information
      • Winter Operations
      • Markets Forum events
      • Operational Transparency Forum
    • Network Access Planning
      • Back
      • Industry information
      • Network Access Planning
      • What happens when there's an outage?
      • eNAMS
      • Accelerated Loss of Mains applications
  • Our strategy
    • Back
    • Home
    • Our strategy
    • Our RIIO-2 Business Plan
      • Back
      • Our strategy
      • Our RIIO-2 Business Plan
      • How we're performing under RIIO-2
      • RIIO-2 Stakeholder Group
      • Previous plans and documents
      • Get involved
    • Annual report and accounts
  • Research & publications
    • Back
    • Home
    • Research & publications
    • Future Energy Scenarios (FES)
    • Network Options Assessment (NOA)
    • ​Electricity Ten Year Statement (ETYS)
    • Markets Roadmap
    • Summer Outlook
    • Winter Outlook
    • Whole electricity system
    • System Operability Framework (SOF)
    • Regional Development Programmes
    • Balancing Market Review

Breadcrumb

  • Industry information
  • Codes
  • Connection and Use of System Code (CUSC)

CMP271: Improving the cost reflectivity of demand transmission charges

Proposed that the transmission charging methodology should include a Peak Security demand tariff levied at Triad, a Year round demand tariff & revenue recovery levied on a year round supplier.

Modification status: Current - Workgroup

Last updated: 9 August 2022

Code Administrator Contact: [email protected]

Governance Route: Standard 

Impacts: High impact on Generators, Suppliers, Embedded Generators

 

Proposed by:

Bill Reed

  • [email protected]

Documents

Proposal Documents Workgroup Meetings and Summary papers Workgroup Consultation Workgroup Report Code Administrator Consultation Draft / Final Modification Report Decision

Proposal Documents

PublishedName
11 Oct 2016CMP271 Improving the cost reflectivity of demand transmission charges
1

Workgroup Meetings and Summary papers

PublishedName
14 Apr 2017Meeting 7 - Agenda CMP271 and CMP274 precall 26th April
11 Apr 2017Meeting 6 - Agenda CMP271 and CMP274 4th April 2017
14 Mar 2017Meeting 5 - Agenda CMP271 and CMP274 16 03
2 Mar 2017CMP271 - Terms of Reference Final 2_3
2 Mar 2017CMP271 and 274 Panel approved timetable
2 Mar 2017Meeting 5 - Agenda CMP271 and CMP274 precall
2 Mar 2017Meeting 4 - Agenda CMP271 and CMP274 precall
2 Mar 2017Meeting 4 - Agenda CMP271 and CMP274 17th Feb 2017
2 Mar 2017Meeting 3 - Agenda CMP271 and CMP274 precall
2 Mar 2017Meeting 3 - Agenda CMP271 and CMP274 13_01
2 Mar 2017Meeting 2 - Agenda CMP271 and CMP274 28 November 2016
2 Mar 2017Meeting 1 - Agenda CMP271
17 Jun 2017Meeting 8 - Agenda CMP271 and CMP274 24_07 and CMP276 Meeting 4
26 Jul 2017wj0071 CMP271 Cost Reflectivity Thoughts Jan17 v02
26 Jul 2017wj0072 CMP271 Cost RecoveryThoughts Jan17 v01
26 Jul 2017wj0075 CMP271 Residual cost recovery thoughts Jan17 v02
16

Workgroup Consultation

Sorry, no documents found.
0

Workgroup Report

Sorry, no documents found.
0

Code Administrator Consultation

Sorry, no documents found.
0

Draft / Final Modification Report

Sorry, no documents found.
0

Decision

Sorry, no documents found.
0
National Grid ESO
© National Grid 2023

Connect with us

  • Twitter
  • LinkedIn
  • Youtube
  • Instagram
  • Contact us
    • Media centre
    • Work for us
  • Information
    • Privacy policy
    • Cookie policy
    • Terms and conditions
    • Security
    • Modern Slavery Statement
© National Grid 2023
Top