CMP222: User Commitment for Non-Generation Users

This Proposal seeks to introduce enduring user commitment arrangements for sites where there is an offtake of electricity from the transmission system, specifically Interconnectors, Distribution Network Grid Supply Points and directly connected loads.

Modification status: Concluded

Last updated: 18 June 2020

Code Administrator Contact: Jade Clarke - [email protected]

Governance Route: Standard 

Impacts:

* High: For non-generation Users: Interconnectors, Distribution Network Grid Supply Points (GSPs) and Directly Connected Loads

Implemented: 1 April 2015