CMP194: Housekeeping modifications to Section 11 of the Connection and Use of System Code (CUSC)

As a consequence of the incorporation of the Charging Methodology Statements into Section 14 of the CUSC, this proposal seeks to make non-material changes to Section 11 of the CUSC to incorporate definitions previously described in Section 14.

Modification status:
Concluded - CMP194: Housekeeping modifications to Section 11 of the Connection and Use of System Code (CUSC)
Last updated:
20 March 2024

Code Administrator Contact: Steve Lam - [email protected]

Governance Route: Self-Governance 

Impacts:

* Low: Existing signatories to the CUSC. National Electricity Transmission System Operator (NETSO)

Documents