CMP193: Housekeeping modifications to Section 14 of the Connection and Use of System Code (CUSC)

This proposal seeks to make a number of non-material changes to Section 14 of the CUSC to better incorporate the Charging Methodology Statements into the main body of the CUSC. This includes consequential non-material changes to Section 11 of the CUSC to incorporate definitions previously described in Section 14.

Modification status: Concluded

Last updated: 18 June 2020

Code Administrator Contact: Steve Lam - [email protected]

Governance Route: Self-Governance 

Impacts:

* Low: Existing signatories to the CUSC. National Electricity Transmission System Operator (NETSO)

Documents

Proposal

Workgroup meetings and summary papers

Sorry, no documents found.

Workgroup Consultation

Sorry, no documents found.

Code Administrator Consultation

Draft/Final Modification Report

Decision

Sorry, no documents found.